Web BPMN Diagram Elements with Automation

Here is a list of web BPMN diagram elements with Automation properties.

Element Name

Visual

Comments

Pool

image2018-5-9_8-11-25.png

At least one Pool is required. Multiple Pools are allowed in the diagram, but message flow is not automated between Pools.

Lane

image2018-5-9_8-13-20.png

It's good practice to assign a user or group to the Lane. By default, tasks within a Lane are performed by the group or user assigned to it.

Selected "Task" Shapes

image2018-5-9_8-22-16.png

The "Generic Task", "Manual Task", "Automatic Task", "Automated Service Task" and "User Task" can all perform automation tasks and events.

The "Send Task" and "Script Task" are special – see descriptions below.

Event

image2018-5-9_8-51-18.png

The first Event is the "Start" Event and requires Owner, Starter, and Deployer definitions. The last Event in a flow can have "end complete process" selected to cancel other parallel flows.

Send Task

image2018-5-9_8-27-49.png

Sends automation emails.

Script Task

image2018-5-9_8-36-2.png

Performs automation events only and no tasks.

Signal

image2018-5-9_8-29-49.png

Indicates a timer wait and can perform Events. The shape text can indicate the duration of the wait, but a timer is not initiated by a Signal shape.

Exclusive Gateway

image2018-5-9_8-30-17.png

Branches the automation flow. Parallel gateways also branch the automation flow, but there are no automation properties on parallel gateways.